After returning to work from our winter breaks, we set about a variety of estate work around the Grasmere area. Our first job was to repair some damage caused by Storm Arwen to a couple of dry stone walls at Hunting Stile.
The walls had been knocked down by low hanging branches and possibly also disturbed by tree root-plates, when the trees were being buffeted about during the strong winds. We removed the offending branches to stop any future damage and set about putting up the walls. One of the collapsed walls contained a large slate that had been used for hanging the top pin of a gate (photo below). The slate had to be carefully lifted into place, utilising our full team of four people, so that the gate could be re-hung.
Repaired wall and gate
Once we'd completed the wall repairs we turned our attention to erecting some owl and bat boxes around High Close Estate. The boxes had been kindly donated by the local
Age UK's Men in Sheds project which offers support for older men to share and learn new skills. We'll keep a check on them throughout the year and hopefully they'll provide some extra roosting/nesting places to the resident bat and Tawny Owl population.
Owl and bat boxes
Our final job before resuming our work on the fells was a fencing job at Bracken Fell. Due to the difficult access to the site the materials could only be driven part way. Once everything was unloaded from the trailer we had to load up the power barrows to move the materials to the bottom of the fence line.
Fencing materials
We were repairing over 400 metres of the fence, although the full length was well in excess of 600 metres. The posts, rails and wire all had to be carried by hand through the rough terrain and all the old fence posts and wire that we were replacing had to be carried back out.
First section of fence
The majority of the fence consisted of short sections of strained wire stock fencing.
Wire stock fence
In some areas the underlying bedrock was too close to the ground's surface to dig in the straining post required for a wire fence, so here we put in sections of post and rail as they require less depth.
Once we'd completed the fence and carried all the excess materials and old fencing off the site we were straight up onto Loughrigg Fell, filling helicopter-bags ready for the start of another season of path repairs.