Wednesday 22 April 2015

Repairing the path at Aira Force

Since finishing the tree cages we've mostly been working over at Aira Force, carrying out some urgent path repairs. One section we've been working on can be seen in the photo below. It shows the original path to the right, which people had started to avoid due to the bedrock that is protruding. A new, lower path had started to form, which is potentially dangerously close to a steep drop down to the river.

 Before starting work

Firstly, we moved some large rocks from the original path to form an edge to the lower path. Any bedrock sticking up into the new path was broken with crowbars and sledgehammers until it was low enough to cover with gravel.

 Starting to build up the edge

As well as using the stone from the old path, we gathered some large boulders from higher up the bank to continue the edging. This would help keep people away from the edge of the river bank and give us a suitable edge to gravel against.

 Edging almost completed

The next job was to dig a trench to divert any water off the new path; this fed into a pipe underneath the path and out into the river. Ideally we'd have built a stone drain but there was not enough suitable material nearby so we had to make do with plastic pipe, though we made sure it was well concealed.

 Digging in the drain pipe

With the new edging and drainage in place all that was left to do was the graveling. We put some turf over some of the path edges and we 'll put grass seed down to help the soil revegetate more quickly and soon you'd never know the other path existed. The new path is now much safer, easier to use and a much better line. It'll allow people to enjoy there surroundings and not have to think as much about where they're walking.

Turfing the freshly graveled path

No comments:

Post a Comment